After a rest day (Sunday) from the garden (spent river testing in the morning, brunch at Timothy & Birch, more water analysis in the afternoon and getting ready for a visitor), it was back to work on Monday 7th April. I had left the polytunnel in this condition at close of play on Saturday 5th April ...
![]() |
Photo 1: Polytunnel at the Start of the Day (7/4/25) |
Having mulched all the raised beds with recovered spent coir compost, the remaining coir was dumped on the vegetable beds ...
![]() |
Photo 2: Recovered Coir on Vegetable Beds |
A fresh solution of Citrox P was prepared to finish the wash/disinfect stage of the cleaning process. It took most of the afternoon but I did finally complete this task.
![]() |
Photo 3: Cleansed Equipment on the Patio |
While the polytunnel itself is not yet tidy, the messiest job is now complete ...
![]() |
Photo 4: Easy Part of the Clean-up to Come (end of play, 7/4/25) |
Once I've cleared out the last bits of rubbish, I can return the Quadgrows and Veg/Salad Planters to the polytunnel before moving onto the next stage.
0 comments:
Post a Comment